What should be ensured when installing and maintaining a check dam?

Prepare for the Walmart Stormwater Pollution Prevention Test. Study with quizzes and flashcards, featuring hints and explanations for each question. Gear up for success!

When installing and maintaining a check dam, it is essential that the low point of the check dam is situated in the middle of the channel. This positioning allows for optimal sediment capture while effectively slowing down the flow of water. When the low point is located in the middle, it ensures that the water is forced to rise behind the dam, promoting sediment deposition in the upstream area. This design is particularly important for managing erosion and preventing sediment runoff into adjacent water bodies.

Positioning the low point of the check dam at the beginning of the channel could lead to inefficiencies in sediment capture and may not adequately control water flow. Similarly, having the low point at the end of the channel would defeat the purpose of improving sediment management. The options discussing the dam's height and material do not address the fundamental design aspect that is crucial for its effective function in sediment management and water flow control.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy